Blog / Framer & site building /
A workflow for client review and approval in Framer
A client leaves a comment on a Framer page that has since changed. Another reviewer approves a component the design team is still editing. Without a clear process, feedback turns into old screenshots, private messages and conflicting opinions.
A good review and approval workflow lets clients make informed decisions without giving every comment equal weight or exposing unfinished work by accident. It needs clear scope, a review environment, decision ownership and a record of what was approved.
Define what is being reviewed
Set the review stage and scope: content accuracy, design, functionality, accessibility, SEO signals or launch readiness. Tell the client whether they’re looking at a draft concept or a near-final build. Don’t ask for general feedback when you need a specific decision.
Identify the pages and components included, the version or date and the questions the reviewer should answer. If a shared component appears across several pages, explain that one comment may affect multiple routes.
Name the final decision-maker before anyone opens the link, plus the people who give input. Gather comments from relevant stakeholders, but don’t treat every preference as a requirement. The project owner reconciles feedback against the agreed goals.
Prepare the review environment
Use a preview or staging environment with access suited to the client. Confirm whether drafts are publicly accessible and how links can be shared safely. I wouldn’t put sensitive or unreleased information behind an unprotected preview.
Make sure the reviewer sees representative content and functionality. Placeholder text can distort layout and prevent accurate content review. If something is intentionally incomplete, label it so reviewers do not mistake it for a defect or approved copy.
Provide a simple way to comment with page location, device context and expected behaviour. Screenshots can help, but they need a timestamp or version reference because the page may change after capture.
Triage feedback consistently
Classify comments as factual correction, usability issue, accessibility concern, brand preference, scope change or defect. This helps the team respond with the right owner. A factual error may need immediate correction; a new feature request may require a change discussion.
Ask for evidence when feedback conflicts with a requirement. If one stakeholder wants a shorter page and another wants more detail, clarify the audience and task. Don’t settle a design question on seniority or the loudest comment.
Record what is accepted, declined or deferred and why. I keep it to a short reply: it stops a reviewer repeating the same request and leaves the team a usable history.
Protect the approval boundary
Define what approval means. Does it approve the copy, visual design, functionality, content model or all of them? Ensure the client knows what remains outside the review. Do not treat silence as approval for high-impact decisions unless that process was explicitly agreed.
When the client approves a version, record the date and version. Changes after approval should be reviewed if they affect the approved scope. Keep a path for urgent corrections without reopening every settled detail.
Framer project permissions and publishing behaviour vary by setup and may change, so check current capabilities in the project. I wouldn’t give editor access when a comment-only review is enough, or promise a permission mode the project doesn’t support.
Close the loop
After changes, show what was addressed and ask for a focused final check. Verify mobile layouts, links, forms, metadata and other agreed release criteria. Capture unresolved issues and their owners before launch.
Archive or close feedback threads when the review is complete. Keep final decisions in the project record rather than relying on a long comment history.
Keep feedback tied to a version
When a reviewer comments, preserve which page version they saw. A note such as “the headline feels wrong” is difficult to act on if the headline has since changed. Use a version identifier, date or screenshot with context and close obsolete threads after the new version is shared.
Set a comment window and explain how late feedback will be handled. A deadline does not mean the team ignores critical factual or accessibility problems; it helps distinguish a required correction from a new preference or scope change. Keep a route for urgent issues.
If several stakeholders provide conflicting comments, summarise the decision and ask the accountable person to confirm it. Do not make the client reconstruct the disagreement from a long thread. Record deferred requests separately so they can be discussed as future work.
Keep scope changes separate from review comments
A review may uncover a genuine requirement that was not in the original scope. Record it as a change request with impact on timing, budget or launch readiness. Do not hide a new feature inside a comment thread and then treat delivery as a simple revision.
For subjective feedback, ask what user task or brand requirement the preference supports. A comment such as “make this feel more premium” needs clarification before implementation. Translate the preference into a reviewable direction, then confirm the stakeholder agrees.
Related reading
- A Framer review workflow for page changes across teams
- A handover checklist for Framer components and CMS fields
- When a marketing site belongs in Framer CMS
If the client rejects a recommended change, document the trade-off without making the review adversarial. The project owner is responsible for presenting risks and options; the client is responsible for business choices within the agreement. How will you distinguish a correction from a new request before work begins?