Blog / Arabic & GCC search /

What to document when an Arabic website launches in stages

The Arabic site goes live in stages. The homepage is ready. Half the categories are reviewed. The contact form is still in English, and the returns policy hasn’t been translated. Three months on, ask the team what’s live and you’ll get four different answers.

Without a clear record, users and search engines meet an inconsistent experience. Document what’s live, what’s limited and who owns each next step.

Record scope and status

List the languages, URLs, templates and functions in each release. Mark content as reviewed, pending or intentionally unavailable, and say why. Don’t present a partial page as complete when key information is missing. I’d rather publish a short honest status page for the team than rely on everyone’s memory.

Coordinate dependencies

Track language review, technical implementation, product facts, forms, analytics and support readiness. Decide whether incomplete sections should be accessible, redirected or held back, based on their purpose and risk. Protect staging and test URLs while the work continues.

Plan the next release

Set an owner and acceptance criteria for each stage. After launch, verify the navigation, the right-to-left rendering and the whole user path, from landing to conversion or support.

A quick way to start

Create a simple table with four columns: area, status, owner and next step. Add one row for each section: homepage, categories, products, forms, checkout, policies, emails. Update it at every release and share it with support and marketing.

It takes ten minutes to build and saves hours of confusion.

Mistakes to avoid

Don’t label a page “done” if the form on it is still in English.

Don’t link to unfinished pages from navigation without a clear fallback.

Don’t leave the status in one person’s head. If they’re away, the team is guessing.

A worked example

Suppose the first release includes the homepage, five category pages and twenty products in Arabic. The second release will add the rest of the catalogue, and the third the checkout and emails. A status sheet shows this in one view, and support can answer “is the Arabic checkout ready?” without asking anyone.

It also protects the search side. If only twenty products are in Arabic, internal links in Arabic pages shouldn’t point at English-only pages without saying so. A page that says “this product is currently available on our English site” is better than a surprise language switch.

Update the sheet at every release, and review it before announcing anything. Marketing should know what is ready before it promotes it.

Keep the sheet somewhere everyone can read, such as a shared document, and put the date at the top. An out-of-date status is worse than none because people trust it. Give someone the job of updating it at each release, and make it part of the launch checklist, so it never depends on goodwill.

When you plan the next stage, look at the one before: what was missed, which questions came from customers, which pages needed a fix. Those answers should feed the next acceptance criteria.

Make the review reusable

Write down the decision the record needs to support, and the evidence that could change it. “Document the launch” is too vague to maintain.

Say the Arabic product pages are live but the checkout is still English. For a customer, that’s a surprise at the worst moment. A status sheet that flags “checkout: English only, due next release” lets support and marketing set expectations, and stops the team promoting the Arabic site too early.

Take one user path and follow it through the Arabic site, marking each step as ready, partial or missing. Ask the owner for a normal page and an exception, such as a page that must stay in English for legal reasons.

If a status is unclear, mark it unknown and ask someone qualified. Don’t let an optimistic spreadsheet cell stand in for a check.

Keep a note of why each decision was made and what it replaced. Name one person who approves content and one who verifies the technical side. Make exceptions visible and scoped.

Update the record at every release. What would someone need to know to understand which part of the Arabic site is ready?